Previous Projects


 
Cannon Construction has been providing copper, data and fiber cabling systems since 1985. Before EIA/TIA was able to introduce today's industry standards, CCI was guiding customers through outside plant and premise cabling decisions with great success. Here are just a few of our previous accomplishments. (References furnished upon request.)
 


 
Vandenberg Project
Vandenberg AFB
Lompoc, CA - Complete Basewide Infrastructure Upgrade

  • Over 750,000 lineal feet of fiber optic cable in and out of 438 manholes
  • Placement of 93 Manhole / Handholes
  • 130,000 lineal feet of rock sawing
  • 7,000 lineal feet of directional boring
  • 100,000 lineal feet of cable plowing
  • 50,000 lineal feet of trenching of duct banks

 


 
Tinker Project
Tinker AFB
Oklahoma City, OK - Outside Plant

  • Placed 50 manholes
  • In excess of 20,000' of directional drilling
  • 150,000 of maxcell installed
  • 380,000' of fiber cable placed on conduit
  • 42,000' lineal feet of trenching
  • 12,000 fusion splices
  • 83,000' of fiber zipcord placed

 


 
Guam Project
Andersen AFB
Guam, USA

  • 20,000' of placing duct bank
  • Placement of 40 manholes
  • Placement, splicing and termination of 80,000' of copper and fiber cable to support the flight line operation

 


 
Secure site

Kwajalein Atoll
Marshall Islands


  • Placed 18,800' of Maxcell
  • Placed 77,000' of fiber optic cable
  • Placed 1,800' of direct buried fiber optic cable
  • Spliced 660 strands of fiber optic cable
  • Terminated and tested 2,600 strands of fiber optic cable
  • Build raceway and pathways in 36 building





 

Cheyenne, Air National Guard
Cheyenne, WY

  • Perform GPS survey of all new build and create CFLD file
  • Excavate and install 24 manholes
  • Excavate and install 8,000 of conduit systems
  • Directional bore 4,000' of conduit systems
  • Installed 35,000' of Maxcell
  • Installed 40,000' of fiber optic cable
  • Terminated and installed over 1,600 strands of fiber
  • Installed pliable raceway, FODP's, racks and cabinets to 18 buildings

 


 

Fort Greely
Delta Junction, AK

  • 17,750' of duct bank placement
  • Excavation and placement of 11 manholes
  • One manhole rebuild
  • Placement of 12,500' of copper cabling
  • Placement of 6,105' of fiber cabling
  • Splicing of 1,800' copper cable pairs
  • Place 7,400' of fiber optic cable
  • Built pathway to 51 buildings

 


 


 

Hickam AFB
Honolulu, HI


  • Base wide site survey and design of existing infrastructure for future upgrades in late 2010.

 


 

Friends of the American Lake Veterans Golf Course
VA Hospital, Lakewood, WA

  • Underground Power upgrades
  • Telecommunication upgrades
  • Manhole placement


 


 

McChord CITS Project
McChord AFB, WA


  • Installed a fully compliant Distribution system to 180 buildings
  • Excavate & installed 39 manholes
  • Installed 4,500' of various sized conduit duct banks
  • Installed 160,000' of Maxcell
  • Installed 120,000' of fiber optic cable
  • Relocated 200 cabinets / racks and installed cable management
  • Installed 1,400' of plenum innerduct
  • Installed 80 wall & floor mount cabinets

 


 


 

Time Warner Telecommunications
Greater Puget Sound Region

  • Aerial Fiber placement
  • Manhole excavation and placement
  • Duct bank excavation and placement
  • Boring Operations
  • Raceway, pathway placement to communication closets

 


 
Secure site
Bangor Naval Base
Bremerton, WA


  • 70,000' of fiber pulling
  • 4,200 strands of fiber spliced
  • 22,000' of rod and rope
  • 1,300' of EMT installed
  • 14,000' of inner duct placed

 


 

Above Net Communications
Greater Puget Sound Region

  • Excavation and placement of manholes
  • Excavation and installation of duct banks
  • Raceway and pathway installation to communication closets
  • Boring operations
  • Fiber optic cable installation & splicing

 


 

Puyallup School District
Pole Survey & Design

  • Survey existing poles for future infrastructure
  • 1,050 poles (30 miles)




 


 

Level (3) Communications
Fiber Ring
Bellevue, WA

  • 95,000' of Fiber Optic cable placement in existing infrastructure
  • Placed an average of one mile of fiber per day

 


 

Building 2026 remodel
Barracks to offices conversion
Joint Base Lewis-McChord

  • Installed 800' of tray and pathway
  • Installed 4,000' of 1" EMT
  • Installed 20 miles of CAT 6 cable
  • Terminated 191 locations for Voice and Data

 


 

Fort Richardson Army Base
Alaska

  • 5,100' of duct bank placement
  • Excavated and installed 16 vaults
  • Installed 11,800' of copper cable
  • Installed 18,000' of fiber optic cable
  • Spliced and terminated copper & fiber optic cable
  • Built raceway and pathway in 29 buildings

 


 

Qwest Railroad Bore

  • 200' of 18" "Dry Bore" under 5 railroad Tracks
  • 4 Way Duct run though DOT Right of Way

 


 

City Of Gresham: Automated Meter Infrastructure Project

  • Remove and replace 12,335 water meters with a "Smart" meter that transmits usage directly to the city.


 


 