Cannon Construction has been providing copper, data and fiber cabling systems since 1985. Before EIA/TIA was able to introduce today's industry standards, CCI was guiding customers through outside plant and premise cabling decisions with great success. Here are just a few of our previous accomplishments. (References furnished upon request.)
|
| Vandenberg AFB Lompoc, CA - Complete Basewide Infrastructure Upgrade
- Over 750,000 lineal feet of fiber optic cable in and out of 438 manholes
- Placement of 93 Manhole / Handholes
- 130,000 lineal feet of rock sawing
- 7,000 lineal feet of directional boring
- 100,000 lineal feet of cable plowing
- 50,000 lineal feet of trenching of duct banks
|
| Tinker AFB Oklahoma City, OK - Outside Plant
- Placed 50 manholes
- In excess of 20,000' of directional drilling
- 150,000 of maxcell installed
- 380,000' of fiber cable placed on conduit
- 42,000' lineal feet of trenching
- 12,000 fusion splices
- 83,000' of fiber zipcord placed
|
| Andersen AFB Guam, USA
- 20,000' of placing duct bank
- Placement of 40 manholes
- Placement, splicing and termination of 80,000' of copper and fiber cable to support the flight line operation
|
 |
| Secure site |
|
| Kwajalein Atoll Marshall Islands
- Placed 18,800' of Maxcell
- Placed 77,000' of fiber optic cable
- Placed 1,800' of direct buried fiber optic cable
- Spliced 660 strands of fiber optic cable
- Terminated and tested 2,600 strands of fiber optic cable
- Build raceway and pathways in 36 building
|
| Cheyenne, Air National Guard Cheyenne, WY
-
Perform GPS survey of all new build and create CFLD file
-
Excavate and install 24 manholes
-
Excavate and install 8,000 of conduit systems
-
Directional bore 4,000' of conduit systems
-
Installed 35,000' of Maxcell
-
Installed 40,000' of fiber optic cable
-
Terminated and installed over 1,600 strands of fiber
-
Installed pliable raceway, FODP's, racks and cabinets to 18 buildings
|
| Fort Greely Delta Junction, AK
- 17,750' of duct bank placement
- Excavation and placement of 11 manholes
- One manhole rebuild
- Placement of 12,500' of copper cabling
- Placement of 6,105' of fiber cabling
- Splicing of 1,800' copper cable pairs
- Place 7,400' of fiber optic cable
- Built pathway to 51 buildings
|
| Friends of the American Lake Veterans Golf Course VA Hospital, Lakewood, WA
- Underground Power upgrades
- Telecommunication upgrades
- Manhole placement
|
| McChord CITS Project McChord AFB, WA
- Installed a fully compliant Distribution system to 180 buildings
- Excavate & installed 39 manholes
- Installed 4,500' of various sized conduit duct banks
- Installed 160,000' of Maxcell
- Installed 120,000' of fiber optic cable
- Relocated 200 cabinets / racks and installed cable management
- Installed 1,400' of plenum innerduct
- Installed 80 wall & floor mount cabinets
|
| Time Warner Telecommunications Greater Puget Sound Region
- Aerial Fiber placement
- Manhole excavation and placement
- Duct bank excavation and placement
- Boring Operations
- Raceway, pathway placement to communication closets
|
 |
| Secure site |
|
| Bangor Naval Base Bremerton, WA
- 70,000' of fiber pulling
- 4,200 strands of fiber spliced
- 22,000' of rod and rope
- 1,300' of EMT installed
- 14,000' of inner duct placed
|
| Above Net Communications Greater Puget Sound Region
- Excavation and placement of manholes
- Excavation and installation of duct banks
- Raceway and pathway installation to communication closets
- Boring operations
- Fiber optic cable installation & splicing
|
| Puyallup School District Pole Survey & Design
- Survey existing poles for future infrastructure
- 1,050 poles (30 miles)
|
| Level (3) Communications Fiber Ring Bellevue, WA
- 95,000' of Fiber Optic cable placement in existing infrastructure
- Placed an average of one mile of fiber per day
|
| Building 2026 remodel Barracks to offices conversion Joint Base Lewis-McChord
- Installed 800' of tray and pathway
- Installed 4,000' of 1" EMT
- Installed 20 miles of CAT 6 cable
- Terminated 191 locations for Voice and Data
|
| Fort Richardson Army Base Alaska
- 5,100' of duct bank placement
- Excavated and installed 16 vaults
- Installed 11,800' of copper cable
- Installed 18,000' of fiber optic cable
- Spliced and terminated copper & fiber optic cable
- Built raceway and pathway in 29 buildings
|
| Qwest Railroad Bore
- 200' of 18" "Dry Bore" under 5 railroad Tracks
- 4 Way Duct run though DOT Right of Way
|
|
City Of Gresham: Automated Meter Infrastructure Project
- Remove and replace 12,335 water meters with a "Smart" meter that transmits usage directly to the city.
|
|